Safe outage evidence log
- Classify the outage
- Match feeder and date
- Save the notice
- Protect account details
- Record start, end, and fault reference
Check the feeder and area, not only the suburb
Load-shedding schedules are tied to network groups or feeders. Nearby homes can be supplied by different feeders, while some customers share feeders with essential services. Match the schedule label on the notice and keep the date. A city-wide social post may be too broad to explain one street.
Ask whether neighbours on the same section of network are affected, but do not touch damaged equipment or approach fallen lines. A single property problem may involve the installation, breaker, meter, or account. Electrical safety comes before online diagnosis.
Outage status belongs with the site's public-service verification guides, where current notices, location limits, safety, and later updates are checked separately.
After completing the check, ask What has changed across Zimbabwe? The homepage connects current reporting with the source guides needed to verify it.
Separate scheduled and unscheduled events
A schedule describes a planned response to an expected shortfall. ZETDC notes that faults or interconnection events can require additional shedding outside the programme. Therefore, a mismatch with the schedule does not by itself prove that the published schedule was fake.
Planned maintenance should identify the affected area and time window. Save the original notice and check whether restoration updates were issued. If an outage extends beyond the window, report the new fact and seek a fault reference.
Storm-related outages should be separated from the forecast and alert evidence in the guide to reading Zimbabwe weather warnings.
Create a safe outage record
Record account area, feeder or schedule group if known, outage start, restoration time, notice URL, fault reference, and observations such as whether street lights or nearby businesses are affected. Do not post a full account number, meter token, phone number, or home address publicly.
For food, medicines, water pumping, or medical equipment, follow safety and service guidance from qualified authorities. A news page can explain the reporting path but cannot promise restoration or tell a person how to repair an electrical installation.
Measure duration without double counting
Use a start and end timestamp for each interruption. If power returns briefly, decide and disclose whether the record treats this as two outages or one unstable period. Add the durations rather than subtracting the first start from the final end when supply was available in between.
For a weekly comparison, keep the same area and method. Crowd reports can show patterns but are not a complete sample because people without power or data may not report. Label the coverage and missing areas.
Crowd reports and recycled schedules need a method to check an outage notice before sharing it as a national pattern.
Report the service response accurately
The ZETDC client charter describes service targets and routes. A target is not proof that every case will meet it. Quote the current target with its conditions, record when the fault was reported, and compare it with the actual response only after restoration.
End an outage article with the last verified update, the source, and the next expected notice. Do not refresh the publication date without adding a real status change.
An outage log that separates causes
Use columns for area, feeder or group, scheduled window, actual start, brief restorations, final restoration, planned maintenance notice, fault reference, and stated cause. This allows planned shedding, maintenance, and faults to be counted separately instead of becoming one vague outage total.
Publish aggregated patterns only when the reporting coverage is clear. A reader-submitted map can undercount rural areas, people without mobile data, and short interruptions. Describe it as a sample and keep official network explanations alongside public observations.
Planned and unplanned events need different evidence
The schedule describes a planned interruption
A load-shedding schedule describes a planned interruption for a named group and period. It does not cover every fault or grid event.
The fault record tracks an unplanned event
A fault reference tracks an unplanned service problem reported to the utility. Restoration time should be recorded separately from the time the fault was reported.
Utility notices, schedules and fault-reporting routes
Source pages can change. The review date above records when this guide's links and method were last checked.